360 E Las Tunas Dr.
We will be breaking ground in March 2016 and have a
10 month construction schedule with unit going for sale in 1 quarter of
2017. This document presents a 3 Million Dollar ($), 2-year program for
the construction of the Las Tunas Medical Plaza, the facility that will
consist of 7 unit Doctor Condominium in a beautifully designed Modern
format. The design is a 2 story building with One mixed unit space on
the first floor which can be used as a Pharmacy, Medical Equipment or
Doctors Office. The second floor consisting of 6 units designed for
Doctor Offices.
|
330 E Las Tunas Dr.
We are in the planning stage at present time. Our
concept is making its way through the City Planning dept. We were able
to purchase the property next to our 360 E Las Tunas Dr. Project which
we will be treating as a Phase 1 and Phase 2 Construction Project with
360 E Las Tunas being Phase 1 and 330 E Las Tunas Dr. as Phase 2. This
document presents a 3 Million Dollar ($), 2-year program for the
construction of the Las Tunas Medical Plaza - Phase 2, the facility that
will consist of 8 unit Doctor Condominium in a beautifully designed
Modern format. The design is a 3 story building with One mixed unit
space on the first floor which can be used as a Pharmacy, Medical
Equipment or Doctors Office.
|
We are in negotiations on Multi use projects in Encinitas, CA.
We are working with an strategic partner to develop warehousing in
the inland empire and the high desert.
|
|
Projects |
Avanston Group’s mission is honored each time we exceed
our client’s expectations, each time we achieve beyond our project
goals, each time we earn repeat business from clients, and each time the
company’s efforts make positive impacts in the world in which we live.
|
|
360/330 E Las Tunas
Dr. San Gabriel, CA. 91776
Offices for 360 & 330 E Las Tunas is in
Pre-Sale now. 360 E Las Tunas will be ready to move in 3rd
Quarter 2017 with 330 E Las Tunas move in 1st quarter of
2019 |
|
|
|